当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Three Gorges left bank station 500KV switching station switch control, data acquisition, scheduling data sent by the LCU 15 ( two LCU : LCU15A, I, left left II : LCU15B ). LCU15A and LCU15B are configured for dual controller cold standby mode, i.e. when the master and slave controller to switch, must stop the main controller, after the backup controller in the main controller during switching, monitoring system would lose the left I or left II switching station equipment remote monitoring and control, and the effects of control room return screen and scheduling data sending.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Three Gorges left bank station 500KV switching station switch control, data acquisition, scheduling data sent by the LCU 15 ( two LCU : LCU15A, I, left left II : LCU15B ). LCU15A and LCU15B are configured for dual controller cold standby mode, i.e. when the master and slave controller to switch, must stop the main controller, after the backup controller in the main controller during switching, monitoring system would lose the left I or left II switching station equipment remote monitoring and control, and the effects of control room return screen and scheduling data sending.
问题补充:

  • 匿名
2013-05-23 12:26:38
三峡离开银行站 500KV 开关站开关控制、 数据采集、 调度数据发送的 LCU 15 (两个 LCU: LCU15A,我,左左的二: LCU15B)。LCU15A 和 LCU15B 的双控制器冷待机模式,即时配置的主人和奴隶的控制器切换,必须停止主控制器、 后在转换中的主控制器中的备份控制器,监测系统将失去左,我或左二开关站设备远程监测和控制,并控制室的影响返回屏幕和调度数据发送。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭