当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:On LCU15A ( LCU15B) maintenance can be divided into two parts : LCU local cabinet overhaul and remote I / O maintenance. Because the remote I / O according to a string arrangement, so that the remote I / O repair with string switch maintenance. Local cabinet overhaul includes controller, PLC of the corresponding period and cabinet. The fastening work, controller for maintenance, to be on the main controller to switch, switching period (about 1 ~ 2 hours, there is a certain risk, because the spare controller not long run, may start without success), II I (left left ) switch station equipment state can not be sent ; while the earlier PLC overhaul will affect the switching of the synchronization operation.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
On LCU15A ( LCU15B) maintenance can be divided into two parts : LCU local cabinet overhaul and remote I / O maintenance. Because the remote I / O according to a string arrangement, so that the remote I / O repair with string switch maintenance. Local cabinet overhaul includes controller, PLC of the corresponding period and cabinet. The fastening work, controller for maintenance, to be on the main controller to switch, switching period (about 1 ~ 2 hours, there is a certain risk, because the spare controller not long run, may start without success), II I (left left ) switch station equipment state can not be sent ; while the earlier PLC overhaul will affect the switching of the synchronization operation.
问题补充:

  • 匿名
2013-05-23 12:26:38
对 LCU15A (LCU15B) 维修可以分为两个部分: LCU 本地柜检修和远程我 / O 维护。因为远程我 / O 根据以一个字符串的安排,以便远程我 / O 修复与字符串交换机维修。本地柜检修包括控制器、 PLC 的同期和内阁。要切换,主控制器上进行维修工程,控制器、 紧固工作转换期间 (约 1 ~ 2 小时,有一定的风险,因为不长时间运行,备用控制器可能不成功的情况下启动),无法发送二 (左左) 切换台设备状态 ;虽然较早前的 PLC 大修将影响开关同步操作。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭