当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Three Gorges left bank Plant 500KV switching station switch control, data acquisition, scheduling data sent by the LCU33 ( I ), LCU34 ( II ) controller. On the right bank of the LCU configuration for hot standby mode, therefore, master and slave controller switches do not affect the monitoring system on the right I ( II right ) switch control station and monitoring.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Three Gorges left bank Plant 500KV switching station switch control, data acquisition, scheduling data sent by the LCU33 ( I ), LCU34 ( II ) controller. On the right bank of the LCU configuration for hot standby mode, therefore, master and slave controller switches do not affect the monitoring system on the right I ( II right ) switch control station and monitoring.
问题补充:

  • 匿名
2013-05-23 12:26:38
三峡左岸厂房 500KV 开关站开关控制、 数据采集、 调度数据发送的 LCU33 (I)、 LCU34 (二) 控制器。右岸 LCU 配置,热待机模式,因此,主从设备控制器开关不影响右 (右二) 切换控制站和监测监控系统。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭