当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:With reference to the left bank power station switching station overhaul LCU, LCU33R ( LCU34R) maintenance is divided into two parts, remote I / O repair with string switch overhauling, maintenance for controller does not affect running personnel remote monitoring, nor for dispatching data caused by impact, according to the maintenance plan, respectively, on the main preparation of controller for overhaul, but at the local PLC concurrent maintenance, will affect the switch synchronization operation, time is about 1 ~ 2 hours.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
With reference to the left bank power station switching station overhaul LCU, LCU33R ( LCU34R) maintenance is divided into two parts, remote I / O repair with string switch overhauling, maintenance for controller does not affect running personnel remote monitoring, nor for dispatching data caused by impact, according to the maintenance plan, respectively, on the main preparation of controller for overhaul, but at the local PLC concurrent maintenance, will affect the switch synchronization operation, time is about 1 ~ 2 hours.
问题补充:

  • 匿名
2013-05-23 12:26:38
关于左岸电站开关站检修 LCU,LCU33R (LCU34R) 维修分为两个部分,远程我 / O 修复与字符串开关检修、 维护的控制器中不会影响运行人员远程监测,也没有调度数据造成的影响,根据维护计划,分别对控制器的检修,但在本地的 PLC 并行维修的主要制备会影响开关同步操作,需时约 1 ~ 2 小时。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭