|
关注:1
2013-05-23 12:21
求翻译:In summary, the switching station LCU overhaul, as the left bank power station LCU cold standby mode controller, remote maintenance for some time lost when the monitor, so consider the half-station full stop, is the best repair method. Although the right bank power station through the main switching station LCU controller switching equipment, the equipment can not affect the monitoring, but there is still some time switch can not operate, so the conditions permit, consider the case of half the power station. For remote I / O, when making string arrangements for repair within the switch.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
In summary, the switching station LCU overhaul, as the left bank power station LCU cold standby mode controller, remote maintenance for some time lost when the monitor, so consider the half-station full stop, is the best repair method. Although the right bank power station through the main switching station LCU controller switching equipment, the equipment can not affect the monitoring, but there is still some time switch can not operate, so the conditions permit, consider the case of half the power station. For remote I / O, when making string arrangements for repair within the switch.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区