|
关注:1
2013-05-23 12:21
求翻译:To sum up, the switching station overhaul LCU, because the left bank power station LCU controller for cold standby mode, maintenance for a long time away lose surveillance, so consider the half-station full stop, is the best way of maintenance. The right bank power station switch station LCU though by main controller switching, can not affect the equipment monitor, but there is still some time switch can not operate, so when conditions permit, may be considered in a station blackout conditions. For remote I / O, in string switch overhauling arrangement.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
To sum up, the switching station overhaul LCU, because the left bank power station LCU controller for cold standby mode, maintenance for a long time away lose surveillance, so consider the half-station full stop, is the best way of maintenance. The right bank power station switch station LCU though by main controller switching, can not affect the equipment monitor, but there is still some time switch can not operate, so when conditions permit, may be considered in a station blackout conditions. For remote I / O, in string switch overhauling arrangement.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区