|
关注:1
2013-05-23 12:21
求翻译:Here is an update on the samples supplied to date which on the most part is very good news. Please see my comments in red on the status report and respond as soon as possible. As regards the 1056_115 clear panel fixing gasket and the 1057_114 speaker seal gasket the parts supplied are approved and correct. The drawings attached are updated to show what side the Liner material must be attached to as the parts are asymmetrical and it is only by good fortune that the samples are correct because this was not specified on the first drawings. You do not have to resample these two parts是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Here is an update on the samples supplied to date which on the most part is very good news. Please see my comments in red on the status report and respond as soon as possible. As regards the 1056_115 clear panel fixing gasket and the 1057_114 speaker seal gasket the parts supplied are approved and correct. The drawings attached are updated to show what side the Liner material must be attached to as the parts are asymmetrical and it is only by good fortune that the samples are correct because this was not specified on the first drawings. You do not have to resample these two parts
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区