|
关注:1
2013-05-23 12:21
求翻译:翻转夹具,先焊接电芯的负极点,然后拔掉热缩管焊接电芯的正极点,各二次四点;是什么意思? 待解决
悬赏分:1
- 离问题结束还有
翻转夹具,先焊接电芯的负极点,然后拔掉热缩管焊接电芯的正极点,各二次四点;
问题补充: |
|
2013-05-23 12:21:38
Flip fixture, the first negative point of welding batteries, and then unplug the batteries heat shrink tubing is welded pole, the second four-point;
|
|
2013-05-23 12:23:18
Flip jigs, first welding,the negative pole, and then unplug heat shrinking tube welding batteries are poles, 2 4 points;
|
|
2013-05-23 12:24:58
Turns over the jig, welds first receives a telegram the core cathode spot, then captures the pyrocondensation tube welding to receive a telegram the core positive electrode spot, each two four;
|
|
2013-05-23 12:26:38
Flip fixtures, welding negative pole of the cell, and then pull the heat shrinkable tube welding cell cathode point, the second four points;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区