|
关注:1
2013-05-23 12:21
求翻译:Preliminary deployment concept based on the interference situation in the L-band and estimated duplexer feasibility anticipates that L-DACS1 FL/RL channel blocks would be placed "in the middle" between fixed L-band UAT/SSR channel allocations (978, 1030, 1090 MHz), providing also sufficient margin to the GPS/GALILEO channels in the upper part of the L-band. With that concept, the sub-range for the FL channels is 985.5 - 1008.5 MHz while the sub-range for L-DACS1 RL channels is 1048.5 - 1071.5 MHz.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Preliminary deployment concept based on the interference situation in the L-band and estimated duplexer feasibility anticipates that L-DACS1 FL/RL channel blocks would be placed "in the middle" between fixed L-band UAT/SSR channel allocations (978, 1030, 1090 MHz), providing also sufficient margin to the GPS/GALILEO channels in the upper part of the L-band. With that concept, the sub-range for the FL channels is 985.5 - 1008.5 MHz while the sub-range for L-DACS1 RL channels is 1048.5 - 1071.5 MHz.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区