当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:连续体系箱梁桥的现浇法有支架浇筑施工法、平衡悬臂施工法、逐跨顶推施工法及移动模架施工法等是什么意思?

待解决 悬赏分:1 - 离问题结束还有
连续体系箱梁桥的现浇法有支架浇筑施工法、平衡悬臂施工法、逐跨顶推施工法及移动模架施工法等
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
Continuous system box girder bridge superstructure law of a stent pouring construction method, balanced cantilever construction law, Construction Law case-by-case basis and cross-relations and mobile model framework construction law, etc.
  • 匿名
2013-05-23 12:24:58
The continual system box beam bridge cast-in-place law has the support to construct the technology, the balance bracket technology, by cross goes against pushes the technology and the motion pould frame technology and so on
  • 匿名
2013-05-23 12:26:38
System of continuous box beam bridge construction method of cast-with stand by pouring, balanced cantilever construction method, the spans thrusting and shuttering construction law
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭