当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Abstract: In the three-phase three-wire power metering, the current transformer secondary circuit is usually sub-phase method and incomplete star connection, analysis of two wiring, when the current transformer secondary circuit using incomplete star when the connection, A, C two-phase impedance value is not equal; When the current transformer secondary circuit, when using sub-phase method, A, C two-phase impedance values 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Abstract: In the three-phase three-wire power metering, the current transformer secondary circuit is usually sub-phase method and incomplete star connection, analysis of two wiring, when the current transformer secondary circuit using incomplete star when the connection, A, C two-phase impedance value is not equal; When the current transformer secondary circuit, when using sub-phase method, A, C two-phase impedance values
问题补充:

  • 匿名
2013-05-23 12:26:38
摘要: 在三相三线电能计量,电流互感器二次回路通常是 sub-phase 方法和完整的星形连接,两个接线分析时使用不完全的电流互感器二次回路明星当连接,A、 C 两相阻抗值不相等 ;电流互感器二次回路时使用 sub-phase 方法 A、 C 两相阻抗值时平等,但低于当明星的连接不完全是太大,所以电能计量中的配置,根据电流互感器二次回路接线两种不同的阻抗特性,选择符合要求的设备集成错误对应到实现电能计量装置的仪表和电压互感器综合的误差最小化。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭