当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The disruption of road and real traffic, so often experienced when a flyover, an underpass or a service is being constructed, can be minimized in those constructions incorporating prefabrication是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The disruption of road and real traffic, so often experienced when a flyover, an underpass or a service is being constructed, can be minimized in those constructions incorporating prefabrication
问题补充:

  • 匿名
2013-05-23 12:26:38
中断的道路和实际的交通,所以常常经历时正在建设一条天桥、 地下通道或服务,可以最小化,这些建设纳入预制中
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭