当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Safety measures: Planer planer must be installed with approval procedures, and operating responsibility, given the man machine operation. The unmanned operation must disconnect the power supply, can not be idle. There must be a protective zero and leakage protector. Regular inspection and maintenance, of some important是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Safety measures: Planer planer must be installed with approval procedures, and operating responsibility, given the man machine operation. The unmanned operation must disconnect the power supply, can not be idle. There must be a protective zero and leakage protector. Regular inspection and maintenance, of some important
问题补充:

  • 匿名
2013-05-23 12:21:38
安全措施:龙门刨床必须与审批程序和操作系统的责任进行安装,由于人机操作。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
安全措施: 必须安装整平机整平机以认同规程和经营的责任给出人机操作。 无人操作必须分开电源,不可能是无所事事的。 必须有一个防护零和漏出保护者。 规则检查和维护,一些重要组分,例如手保险装置,传输零件例如维护外套必须保证它在优良条件。
  • 匿名
2013-05-23 12:26:38
安全措施: 刨刨必须安装与审批程序,并经营责任,给予的人机操作。无人值守必须断开电源,安全,不能闲置。必须有一个保护的零和漏电保护器。定期检查及维修,一些重要的组件,如手安全装置,传动部件保护罩等必须确保它处于良好状态。
  • 匿名
2013-05-23 12:28:18
安全测量:刨工刨工必须以审批程序被任命,操纵责任,考虑到人机器操作。无人的操作必须断开电源,可能不是空闲的。一定会有一个防护零和漏保护器。固定的检验和维护,一些重要组件中,例如控制安全设备,传送部分例如防护封面必须确保那它是情况良好。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区