|
关注:1
2026-06-27
求翻译:本设计为60吨硫酸软骨素的废水处理车间,水量为7000 m3/d,COD量为2000 mg/L,BOD量为12000mg/L,pH为3~5,温度为60~70℃。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
本设计为60吨硫酸软骨素的废水处理车间,水量为7000 m3/d,COD量为2000 mg/L,BOD量为12000mg/L,pH为3~5,温度为60~70℃。
问题补充: |
|
2013-05-23 12:21:38
The design for the 60 tons of chondroitin sulfate wastewater treatment plant, water 7000 m3 d, cod amount of 2000 mg l bod amount of 12000mg l, ph 3 to 5, the temperature is 60 ~ 70 ℃.
|
|
2013-05-23 12:23:18
This design is 60 tons of sulfuric acid from cartilage of the wastewater treatment plant, water is 7000 M3 d, COD amount is 2000 mg L BOD volume, to 12,000 mg L pH, for 3 to 5, the temperature is 60 to 70 °C .
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
This design of 60 tons of chondroitin sulfate wastewater treatment plant, water for 2000 to 7000 m3 d,COD mg L,BOD for 12000mg L,pH for 3~5, temperature of 60~70℃.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区