|
关注:1
2013-05-23 12:21
求翻译:根据PMC生产生成的物料需求报表负责订单下达,交期确认。并根据预测变化及时调整到料状况以便合理控制库存。及material liability的管控。及协调异常处理。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
根据PMC生产生成的物料需求报表负责订单下达,交期确认。并根据预测变化及时调整到料状况以便合理控制库存。及material liability的管控。及协调异常处理。
问题补充: |
|
2013-05-23 12:21:38
Responsible for the material requirements report generated by the pmc production order is placed, delivery confirmation. And timely adjustment according to the forecast changes to the material condition to the reasonable control of the inventory. And control of material liability. And coordinated ex
|
|
2013-05-23 12:23:18
Based on the material generated PMC production needs report for order, delivery confirmation. And according to its forecasts change and adapt to the situation for the rational control of inventory. material and liability control. Exception handling and coordination.
|
|
2013-05-23 12:24:58
Is responsible for order form issuing according to the PMC production production material demand report form, the delivery date confirmation.And adjusts the material condition promptly according to the forecast change in order to control the stock reasonably.And the material liability tube controls.
|
|
2013-05-23 12:26:38
Generate item requirement statements according to PMC is responsible for the orders issued, delivery confirmation. And according to the forecast changes in inventory adjustments in a timely manner to the situation so that's reasonable control. And control of material liability. And coordination exce
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区