当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:依据程序定长将所需复合料管移送进入夹具装配架中是什么意思?

待解决 悬赏分:1 - 离问题结束还有
依据程序定长将所需复合料管移送进入夹具装配架中
问题补充:

  • 匿名
2013-05-23 12:21:38
The desired composite material in accordance with the procedures set long tube transferred into the fixture assembly
  • 匿名
2013-05-23 12:23:18
Program length will be based on the composite tube clamp assembly transferred to enter the frame
  • 匿名
2013-05-23 12:24:58
Fixed-length will need the compound material tube based on the procedure to transfer enters in the jig assembly jig
  • 匿名
2013-05-23 12:26:38
Composite material tubes required pursuant to the program will transfer into the fixture Assembly
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭