当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:钢筋笼加工采用长线法施工。钢筋笼分2~4节加工制作,基本节长9m,最后一节为调整节。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
钢筋笼加工采用长线法施工。钢筋笼分2~4节加工制作,基本节长9m,最后一节为调整节。
问题补充:

  • 匿名
2013-05-23 12:21:38
Processing method using long steel cage construction. Reinforcement cage of 2 to 4 manufacture, the basic length and 9m, the last one for the adjustment section.
  • 匿名
2013-05-23 12:23:18
steel cage processing using long-line construction law. Steel-cage processing produce section 2 ~4, basic section 9m long, and a final section Section for adjustment.
  • 匿名
2013-05-23 12:24:58
The reinforcing cage processing uses the long-line production process construction.The reinforcing cage divides 2~4 processing manufactures, fundamental segment long 9m, last for adjustment festival.
  • 匿名
2013-05-23 12:26:38
Processing using the line method of reinforcement cage construction. Reinforcement cage section 2~4 processing, basic length, 9m, the last section to adjust the section.
  • 匿名
2013-05-23 12:28:18
Processing method using long steel cage construction. Reinforcement cage of 2 to 4 manufacture, the basic length and 9m, the last one for the adjustment section.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭