求翻译:墩柱混凝土覆裹带模养生3天后拆除模板,再用土工布外加塑料布包裹并洒水养生,保证立柱表面一直湿润。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
墩柱混凝土覆裹带模养生3天后拆除模板,再用土工布外加塑料布包裹并洒水养生,保证立柱表面一直湿润。
问题补充: |
|
2013-05-23 12:21:38
Wrapped with a molded concrete pier health cover three days after removal of the template, and then wrapped in geotextile and watering regimen plus plastic sheeting to ensure that the surface has been wet column.
|
|
2013-05-23 12:23:18
Pillar concrete reply wrapped with model--three days later dismantled template, re-use plastic construction fabric plus package and healthful, sprinkling water columns that surface has been wet.
|
|
2013-05-23 12:24:58
After the foot stall concrete duplicate binds the belt mold keeping in good health 3 days to demolish the template, again uses the earthwork cloth sur- plastic sheeting to wrap and the water spray keeping in good health, guaranteed the column surface is continuously moist.
|
|
2013-05-23 12:26:38
Pier column concrete clad covered with mold health 3 days later removed template, and geotextile plus will be wrapped spraying water and keeping in, ensure the column surface wetting.
|
|
2013-05-23 12:28:18
Wrapped with a molded concrete pier health cover three days after removal of the template, and then wrapped in geotextile and watering regimen plus plastic sheeting to ensure that the surface has been wet column.
|