当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:On today's railways the story is the same the world over-demands for increased reliability at reduced cost. Leaving aside the trains themselves, the only way that this can be achieved is by improving and expanding Fixed Infrastructure Asset Monitoring (FIAM). In the UK the two biggest contributors to train delays are p是什么意思?

待解决 悬赏分:1 - 离问题结束还有
On today's railways the story is the same the world over-demands for increased reliability at reduced cost. Leaving aside the trains themselves, the only way that this can be achieved is by improving and expanding Fixed Infrastructure Asset Monitoring (FIAM). In the UK the two biggest contributors to train delays are p
问题补充:

  • 匿名
2013-05-23 12:21:38
今天的铁路的故事是相同的要求提高可靠性,降低成本,世界。撇开列车本身,这是可以实现的唯一途径是通过改善和扩大固定的基础设施资产的监控(FIAM)。在英国,列车晚点两个最大的贡献者点和轨道电路。点状态监测已收到超过过去十年的关注,但轨道电路监测往往是贫困的关系。这是部分原因是由于各种轨道电路类型在使用,与广泛之间的直流,交流高电压脉冲和音频类型的区别,但在这些类别的许多变化。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
今天的铁路故事是同一世界 over-demands 来增强可靠性,降低了成本。抛开自己的列车,这是可以实现的唯一途径是通过改善和扩大固定基础设施资产监控 (FIAM)。在英国的两个贡献最大,列车延误的点和跟踪电路。点状态监测已在过去的十年受到多方关注,但轨道电路监测已倾向于穷亲戚。这是部分归功于各种类型的轨道电路在使用中,直流、 交流
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭