|
关注:1
2013-05-23 12:21
求翻译:成立由品质,工程,工艺,生产,样品部门工程师,组成改善小组进行系统分析改善是什么意思?![]() ![]() 成立由品质,工程,工艺,生产,样品部门工程师,组成改善小组进行系统分析改善
问题补充: |
|
2013-05-23 12:21:38
Established by the quality, engineering, technology, production, sample department engineers, composition improvement teams improved system analysis
|
|
2013-05-23 12:23:18
Set up by the quality, engineering, technology, production, and sample composition, division engineer for system improvement teams improve analysis
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
Set up a quality, engineering, technology, production, sample Department engineer, systems improvement team consisting analysis improvement
|
|
2013-05-23 12:28:18
The establishment by the quality, the project, the craft, the production, sample department engineer, forms the improvement group to carry on the system analysis improvement
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区