|
关注:1
2013-05-23 12:21
求翻译:不详之处参见《35KV及以下电缆敷设》94D101-5、《线槽配线安装》96D301-1、《电缆桥架安装》04D701-3、《钢导管配线安装》03D301-3。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
不详之处参见《35KV及以下电缆敷设》94D101-5、《线槽配线安装》96D301-1、《电缆桥架安装》04D701-3、《钢导管配线安装》03D301-3。
问题补充: |
|
2013-05-23 12:21:38
Unknown at See "35kv and below cable laying 94d101-5, trunking wiring installed 96d301-1, cable tray installation 04d701-3" steel conduit wiring installation 03d301-3.
|
|
2013-05-23 12:23:18
See the details and the following 35 KV cable runs of 101 - 94 D online slot 5, the installation of wiring D 96 301 - 1 , the cable bridge mounting D 04 of 701 - 3 , the steel conduit wiring installation of D 03 301 - 3.
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
See the unknown 94D101-5 of the cable of 35KV and below, the line slot wiring 96D301-1 the installation, the cable bridge rack mounting 04D701-3, the steel conduit wiring installation 03D301-3.
|
|
2013-05-23 12:28:18
Is unclear the place to see also "35KV And Following Cable laying" 94D101-5, "Trunking Matches Line Installment" 96D301-1, "Electric cable Bridge Installment" 04D701-3, "Steel Drive pipe Matches Line Installment" 03D301-3.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区