当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All material used for backfill shall be of an acceptable quality, and free from rocks, roots etc. After the ditch has been back filled above the surrounding ground, a side boom or dozer tread shall be used to compact the backfill. This tamping action is not to be done on terrain where drainage tile exists. After the t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All material used for backfill shall be of an acceptable quality, and free from rocks, roots etc. After the ditch has been back filled above the surrounding ground, a side boom or dozer tread shall be used to compact the backfill. This tamping action is not to be done on terrain where drainage tile exists. After the t
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭