|
关注:1
2013-05-23 12:21
求翻译:2.4.10.4. To avoid brittle failures, materials and construction for low temperature service shall be suitable for the minimum design metal temperature in accordance with the codes and other requirements specified. The purchaser and the vendor shall agree on any special precautions necessary with regard to conditions th是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2.4.10.4. To avoid brittle failures, materials and construction for low temperature service shall be suitable for the minimum design metal temperature in accordance with the codes and other requirements specified. The purchaser and the vendor shall agree on any special precautions necessary with regard to conditions th
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
2.4.10.4。\t要避免易碎的失败,材料和建筑的低温服务适用于极小的设计金属温度符合指定的代码和其他要求。采购员和供营商对所有特别防备措施达成协议必要关于也许在操作,维护,运输,架设时发生,委任和测试的情况。
|
|
2013-05-23 12:24:58
2.4.10.4。 要避免易碎的失败,材料和建筑为低温服务为极小的设计金属温度将是适当与指定的代码和其他要求符合。 采购员和供营商对所有特别防备措施达成协议必要关于在操作,维护,运输,架设期间,也许发生,委任和测试的情况。
|
|
2013-05-23 12:26:38
2.4.10.4.为避免易碎的失败,材料和施工温度低服务应适合于根据守则和规定的其他要求的最低设计金属温度。买方和供应商应同意在任何特别的预防措施有必要在操作、 维修、 运输、 架设,期间可能出现的条件上调试和测试。
|
|
2013-05-23 12:28:18
2.4。 为避免出现脆化故障、材料和结构,较低的温度服务应适合于最小设计金属温度按照代码和其他指定的要求。 购买者和供应商应同意在任何特殊的预防措施有关的一切必要的条件,可能会发生在操作、维修、运输、现场安装、调试和测试。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区