|
关注:1
2013-05-23 12:21
求翻译:It has to be accepted that high efficiency designs are larger frame sizes, with greater degree of the copper and iron active materials, and generally the generator will operate with winding temperature rises much below Class ‘B’ limits. The manufacturing costs being much higher than the equivalent design rated at Class是什么意思? 待解决
悬赏分:1
- 离问题结束还有
It has to be accepted that high efficiency designs are larger frame sizes, with greater degree of the copper and iron active materials, and generally the generator will operate with winding temperature rises much below Class ‘B’ limits. The manufacturing costs being much higher than the equivalent design rated at Class
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
它必须接受高效率设计是更大的帧大小,与铜的更加了不起的程度和电烙放射性材料,并且发电器通常将经营与绕温度上升在类“B”极限下。的制造费用高于等效设计对估计在类“H”和它的更低的效率。
|
|
2013-05-23 12:24:58
它必须接受高效率设计是更大的帧大小,以铜的更加了不起的程度和电烙放射性材料,并且发电器一般将经营以绕温度上升在类`B之下’极限。 制造费用高于等效设计对了估计在类`H’和它的更低的效率。
|
|
2013-05-23 12:26:38
它已被接受高效率设计有较大的帧大小,更大程度的铜和铁活性材料和一般发电机将运作与绕组温度升高得多类 'B' 的限度以下。制造成本远高于等效设计额定为类 'H' 和它的低效率。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区