当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:On the day's grid at peak, the reservoir water, reversing switch unit for generating condition, water through the reversible units to the reservoir, the water's potential energy into electricity, to the grid, supplement of peak power shortage;Past midnight, grid in electricity trough, unit will switch for water pump op是什么意思?

待解决 悬赏分:1 - 离问题结束还有
On the day's grid at peak, the reservoir water, reversing switch unit for generating condition, water through the reversible units to the reservoir, the water's potential energy into electricity, to the grid, supplement of peak power shortage;Past midnight, grid in electricity trough, unit will switch for water pump op
问题补充:

  • 匿名
2013-05-23 12:21:38
在当天的电网在高峰期,水库水,正反转开关单元,用于通过可逆单位对水库,水的势能转化为电能,向电网,补充高峰电力短缺的产生条件,水,过了午夜,电网电力
  • 匿名
2013-05-23 12:23:18
在上, 行动中, 向前#正起作用的#在...上; 以...为轴; 以...支持, 挂在...上; 朝, 向   在上, 行动中, 向前   正起作用的
  • 匿名
2013-05-23 12:24:58
在天的栅格在峰顶,水库水,扭转开关单位为引起情况,水通过反演性单位对水库,水的势能到电里,到栅格,峰值功率短缺的补充; 通过午夜,栅格在电低谷,单位为水泵操作方式,用途重复力量,意志抽水水库在功率网格将交换在水库之下向上。我们的国家在60年代末期开始了到对抽的存贮发电站的发展和用途。
  • 匿名
2013-05-23 12:26:38
上一天的网格中的峰值,扭转开关单位创造条件,通过可逆单位到水库,水的势能转化为电能,到网格中,水的水库水补充的高峰时段电力缺口 ;过去的午夜,电槽中的网格单元将切换水泵操作模式,使用冗余电源在电力网格中,将根据水库向上泵水水库。我们的国家开始晚 1960年年代到开发和利用的抽水蓄能电站。
  • 匿名
2013-05-23 12:28:18
在顶峰的日的格子上,水库水,为了生成条件逆转开关单位,至到水库的可逆的单位的水,进到电的水的势能,到格子,高峰力量缺乏的补充;过去午夜,在电钵中的格子,单位将为操纵模式的水泵转换,使用在力量格子中的多余的力量,在水库下将注入水水库 upwards.Our 国家通过到发展的 1960 年末的 s 开始和使用被打的存储电站中。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭