|
关注:1
2013-05-23 12:21
求翻译:The current power infrastructure shall be reconfigured to ensure power from installed plant shall be prioritised to running of the kiln station (Kiln, coal feeding & Raw meal feeding) exclusively on power to be generated from the WHR plant是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The current power infrastructure shall be reconfigured to ensure power from installed plant shall be prioritised to running of the kiln station (Kiln, coal feeding & Raw meal feeding) exclusively on power to be generated from the WHR plant
问题补充: |
|
2013-05-23 12:21:38
目前的电力基础设施将被重新配置,以确保权力从已安装的设备,应优先窑站(窑,给煤及生料饲喂)在权力上必须从WHR厂所产生的运行
|
|
2013-05-23 12:23:18
当前力量基础设施将重新构造保证从安装的工厂的力量完全将给予优先对跑窑驻地(窑,煤炭哺养&哺养未加工的膳食)在力量从WHR植物引起
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
当前电力基础设施应进行重新配置,以确保权力从安装的植物应优先向窑站 (窑、 煤料 & 生料饲喂) 专门就从腰臀比植物生成的权力运行
|
|
2013-05-23 12:28:18
将重新构造当前力量基础设施保证力量从安装的工厂将给予优先到完全哺养在力量的 (窑驻地窑,煤炭哺养&未加工的) 膳食的赛跑从WHR植物引起
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区