求翻译:India\'s Atomic Energy Regulatory Board (AERB) has now completed a preliminary investigation into the incident and said that it resulted from inadequate draining of the hot water before dismantling of the valve began. It concluded that there was no design deficiency in the construction of the valve involved.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
India\'s Atomic Energy Regulatory Board (AERB) has now completed a preliminary investigation into the incident and said that it resulted from inadequate draining of the hot water before dismantling of the valve began. It concluded that there was no design deficiency in the construction of the valve involved.
问题补充:

  • 匿名
2013-05-23 12:21:38
印度\的原子能管理委员会( AERB )目前已经完成了初步调查事件,并表示,它从热水排水不足,导致拆解阀门开始之前。
  • 匿名
2013-05-23 12:23:18
印度\\ ‘s原子能管理板(AERB)现在完成了一次初步调查入事件并且说它起因于不充分排泄热水在折除阀门前开始了。它认为,没有设计缺乏在介入的阀门的建筑。
  • 匿名
2013-05-23 12:24:58
印度\ ‘s原子能管理板 (AERB) 现在完成了一次初步调查入事件,并且说它起因于不充分排泄热水在折除阀门之前开始了。 它认为,没有设计缺乏在介入的阀门的建筑。
  • 匿名
2013-05-23 12:26:38
India\ 的原子能监管委员会 (材料) 现在已完成对事件的初步调查,并说它导致从不足排水热水的阀门的拆解开始之前。它得出结论认为没有设计缺陷阀门的施工中涉及。
  • 匿名
2013-05-23 12:28:18
印度 \ 是原子的能量管理董事会 (AERB) 现在完成了对事件的一项初步调查和说它由于不足热水的排水阀门的拆除之前开始。断定那在被含有的阀门的建筑物中没有设计缺乏。
 
 