|
关注:1
2013-05-23 12:21
求翻译:2:Build the new slide, only small position will welding process.This scheme can ensure the mold production, life and stability, but the die repair costs will be higher than the welding scheme.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2:Build the new slide, only small position will welding process.This scheme can ensure the mold production, life and stability, but the die repair costs will be higher than the welding scheme.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区