当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The challenge at present is that whether can develop the technology to have one well serve as both injection well and extraction well, and has no clog phenomenon in long run, or one well can extract ground water from different aquifer, and optimize the ratio of injection and extraction well.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The challenge at present is that whether can develop the technology to have one well serve as both injection well and extraction well, and has no clog phenomenon in long run, or one well can extract ground water from different aquifer, and optimize the ratio of injection and extraction well.
问题补充:

  • 匿名
2013-05-23 12:21:38
目前的挑战是,能否开发这项技术有一个很好同时作为注入井和开采井,并且没有堵塞现象,在长远来看,还是一个井可以从不同的含水层抽取地下水,优化注射的比例
  • 匿名
2013-05-23 12:23:18
挑战当前是否能很好开发技术有一次好的作为注入井和提取,并且有在历时长久或者一口井的障碍物现象不可能从另外蓄水层取地下水,并且很好优选射入和提取比率。
  • 匿名
2013-05-23 12:24:58
挑战当前是否能很好开发技术有一次好的作为注入井和提取,并且有障碍物现象在历时长久或者一口井不可能从另外蓄水层提取地下水,并且很好优选射入和提取比率。
  • 匿名
2013-05-23 12:26:38
目前的挑战是,是否可以开发这一技术要有一个好作为注水井和提取井,并在长远来看,有无堵塞现象或一井可以从不同的含水层,提取地下水和优化的注射和提取比例的很好。
  • 匿名
2013-05-23 12:28:18
挑战当前是那是否可能开发技术好地让一个担任两个都注射好地和抽取好地,没有在长时间的跑,或一个中好地堵塞现象可以提取来自不同蓄水层的基础,好地优化比率的注射和抽取。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭