|
关注:1
2013-05-23 12:21
求翻译:Schedules – The Project Management team develops production and installation schedules for the entire project. The goal of scheduling is to identify the critical paths of the project, and ensure that the project is constructed according to the order of installation. By organizing the schedule in this way, valuable time是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Schedules – The Project Management team develops production and installation schedules for the entire project. The goal of scheduling is to identify the critical paths of the project, and ensure that the project is constructed according to the order of installation. By organizing the schedule in this way, valuable time
问题补充: |
|
2013-05-23 12:21:38
时刻表 - 项目管理团队开发制作,安装进度为整个项目。
|
|
2013-05-23 12:23:18
日程表–项目管理队开发整个项目的生产和设施日程表。预定的目标是辨认项目的关键路程,并且保证项目根据设施定货被修建。通过这样组织日程表,重要时刻在工作站点被保存通过允许设施在完成项目的全部之前开始在建筑。
|
|
2013-05-23 12:24:58
日程表-项目管理队开发生产和设施日程表为整个项目。 预定的目标是辨认项目的关键路程,并且保证项目根据设施定货被修建。 通过组织日程表这样,重要时刻在工作站点在建筑被保存通过允许设施在完成项目的全部之前开始。 日程表在设备和人力也保证资源调拨以多数费用高效率的方式,并且减少重音和张力。
|
|
2013-05-23 12:26:38
日程安排 — — 项目管理团队开发生产和安装为整个项目的时间表。调度的目标是确定项目的关键路径,并确保项目按安装顺序构造。通过组织中这种方式的时间表,宝贵的时间被保存在工作现场通过允许在完成的建设工程全部前开始安装。附表还确保资源在大多数成本效益的方式,分配和减少设备和人力的应力和应变。
|
|
2013-05-23 12:28:18
安排 - 项目管理队伍为整个项目开发生产和安装安排。安排的目标是标识项目的重要路径,确保项目根据安装的次序被建造。通过因此组织安排,珍贵的时间在建筑业方面完成项目的整体之前被允许安装开始节省在工作的地点。时间表也确保资源按最花去的有效方式被分配,减少压力和在设备和人力上紧靠。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区