当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:To carry out the business of general contractors including but not limited to general construction site management, provision of temporary construction on site utilities, site survey and engineering, disposal and recycling of construction waste, monitoring construction site work schedules and cash flows and maintaining是什么意思?

待解决 悬赏分:1 - 离问题结束还有
To carry out the business of general contractors including but not limited to general construction site management, provision of temporary construction on site utilities, site survey and engineering, disposal and recycling of construction waste, monitoring construction site work schedules and cash flows and maintaining
问题补充:

  • 匿名
2013-05-23 12:21:38
开展总承包,包括但不限于一般的施工现场管理,提供酒店内的公用设施,现场勘查和工程,处置和回收的建筑垃圾,监督施工现场的工作日程和现金流量,并保持准确的记录,临时建筑的业务
  • 匿名
2013-05-23 12:23:18
执行一般承包商的临时建筑事务包括但不限于一般建造场所管理,供应站点公共事业的、勘址和工程学,处置和循环使用建筑废物,监测建造场所日程和现金流动和维护准确纪录
  • 匿名
2013-05-23 12:24:58
执行一般承包商的临时建筑事务包括但不限于一般建造场所管理,供应在站点公共事业、勘址和工程学,处置和循环使用建筑废物,监测建造场所工作计划和现金流动和维护准确纪录
  • 匿名
2013-05-23 12:26:38
开展的包括但不是限于一般施工现场管理,提供的临时施工现场公用设施、 现场勘察、 工程总承包业务处理和回收利用的建筑垃圾,监控施工现场的工作时间表和现金流并保持准确的记录
  • 匿名
2013-05-23 12:28:18
执行一般承包商的商业包括但是不限于一般建筑工地管理,有关地点设施,地点调查和建造浪费的工程,处理和再循环临时建造的条款,监测建筑工地工作安排和现金流量和维持准确的记录
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭