|
关注:1
2013-05-23 12:21
求翻译:The Contractor shall arrange for and furnish to the Architect, samples of any materials, goods or workmanship and perform any tests that may be called for by the Architect for his approval. Any samples and tests approved by the Architect shall be deemed to represent the minimum standard for the part of the Works to whi是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Contractor shall arrange for and furnish to the Architect, samples of any materials, goods or workmanship and perform any tests that may be called for by the Architect for his approval. Any samples and tests approved by the Architect shall be deemed to represent the minimum standard for the part of the Works to whi
问题补充: |
|
2013-05-23 12:21:38
承包商应安排并提供给建筑师,样品的任何材料,产品或工艺,并执行可能由建筑师为他的批准,被调用的任何测试。
|
|
2013-05-23 12:23:18
承包商将安排为并且装备对所有材料建筑师、样品,物品或者手艺并且执行也许被要求由他的认同的建筑师的任何测试。建筑师和测试批准的所有样品将被视为代表他们适用工作的部分的最低标准。
|
|
2013-05-23 12:24:58
承包商将安排为并且装备到所有材料建筑师、样品,物品或者手艺并且将执行也许被要求由建筑师为他的认同的任何试飞。 建筑师和测试批准的所有样品将被视为代表极小值标准为他们适用工作的部分。
|
|
2013-05-23 12:26:38
承包商应安排和提供给建筑师、 样品的任何材料、 产品或工艺并执行可能由他批准建筑师呼吁任何测试。任何样品和测试批准由建筑师应视为代表的最低标准为它们所应用到的作品的一部分。
|
|
2013-05-23 12:28:18
承包商将商定和跟建筑师供给,任何材料的采样,货物或工人资格和实行可能为他的审批被建筑师呼吁的任何测试。任何例子和检查被建筑师批准将是认为代表最小标准对于对于其他们适用的部分工作。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区