|
关注:1
2013-05-23 12:21
求翻译:No variation required by the Architect or subsequently sanctioned by him shall vitiate this contract, provided that no such instructions shall substantially change the scope or object of the contract without the consent of the Employer and the Contractor.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
No variation required by the Architect or subsequently sanctioned by him shall vitiate this contract, provided that no such instructions shall substantially change the scope or object of the contract without the consent of the Employer and the Contractor.
问题补充: |
|
2013-05-23 12:21:38
无由建筑师或随后要求他批准的更改,须抑损本合同,但没有这样的说明应大幅度改变合同的范围或对象没有雇主的同意和承包商。
|
|
2013-05-23 12:23:18
在这样指示不将极大地改变合同的范围或对象,不用雇主和承包商的同意条件下,他需要由建筑师或后来认可的变异不会污损这个合同。
|
|
2013-05-23 12:24:58
在这样指示不将极大地改变合同的范围或对象,不用雇主和承包商的同意条件下,他需要由建筑师或随后认可的变异不会污损这个合同。
|
|
2013-05-23 12:26:38
由建筑师所需或后来经他没有变化应损害本合同,规定,没有这种指示应大幅改变的范围或对象,未经同意,雇主和承包商的合同。
|
|
2013-05-23 12:28:18
没有被建筑师需要,或随后被他认可的变化将 vitiate 这份合同,只要那没有这样的指示实质上将改变范围或无雇主和承包商的同意的合同的物体。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区