当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The drying-out operation must be conducted just before catalyst loading. The best dry- out operation when the coils have cooling medium because the normal operation conditions can be reached and system is tested. Water will be removed from the heater tubes, reactor and associated piping as well as debris.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The drying-out operation must be conducted just before catalyst loading. The best dry- out operation when the coils have cooling medium because the normal operation conditions can be reached and system is tested. Water will be removed from the heater tubes, reactor and associated piping as well as debris.
问题补充:

  • 匿名
2013-05-23 12:21:38
干燥出操作必须只是催化剂装填前进行。
  • 匿名
2013-05-23 12:23:18
必须在催化剂装货之前进行变干的操作。最好变干操作,当卷有冷却介质时,因为正常运行条件可以被到达,并且系统被测试。水从加热器管将被取消、反应器和伴生的管道系统以及残骸。
  • 匿名
2013-05-23 12:24:58
必须在催化剂装货之前进行干燥操作。 最佳烘干操作,当卷有冷却的媒介时,因为正常运行条件可以被到达,并且系统被测试。 水从加热器管、反应器和伴生的管道系统将被取消并且残骸。
  • 匿名
2013-05-23 12:26:38
只是之前加载的催化剂必须进行干燥出操作。最好干出操作当线圈有冷却介质,因为可以达到正常的操作条件和系统进行了测试。水会从加热器管、 电抗器和相关的管道以及碎片中删除。
  • 匿名
2013-05-23 12:28:18
使戒的操作必须正好在装货的催化剂之前被进行。最好的一个在圈有冷却的媒介时外面弄干操作因为正常的操作条件可以被到达和系统被测试。水将从加热器管子被撤销,反应体和联系管道系统以及碎片。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭