|
关注:1
2013-05-23 12:21
求翻译:The Sub-Contractor must guarantee the dumping site is legally, and work in 24 hours, if the dumping site can’t reach the Contractor’s requirement or any breach the Sub-Contract by the Sub-Contractor, the Contractor is entitled to terminate the Sub-Contract.是什么意思?![]() ![]() The Sub-Contractor must guarantee the dumping site is legally, and work in 24 hours, if the dumping site can’t reach the Contractor’s requirement or any breach the Sub-Contract by the Sub-Contractor, the Contractor is entitled to terminate the Sub-Contract.
问题补充: |
|
2013-05-23 12:21:38
分包商必须保证排土场在法律上和工作在24小时内,如果倾倒场地达不到承包商的要求或违反分包合同的分包商,承包商有权终止该子
|
|
2013-05-23 12:23:18
转承包商必须保证倾弃场法律上是,并且工作在24个小时,如果倾弃场不可能由转承包商到达承包商的要求或任何突破口转包,承包商有资格终止转包。
|
|
2013-05-23 12:24:58
转承包商必须保证倾弃场法律上是,并且在24个小时,如果倾弃场不可能由转承包商到达承包商的要求或任何突破口转包,承包商有资格工作终止转包。
|
|
2013-05-23 12:26:38
分包商必须保证倾倒场地是在法律上,和工作在 24 小时内,如果倾倒场地不能达到合同的要求或违反分包合同的分包商,承包商有权终止分包合同。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区