求翻译:It was noted that 2 out of 3 emergency exits doors on the 3rd floor in the assembling workshop of production building A and 2 out 2 emergency exits doors on the 3rd floor in the finish product warehouse of production building B were not installed single motions.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
It was noted that 2 out of 3 emergency exits doors on the 3rd floor in the assembling workshop of production building A and 2 out 2 emergency exits doors on the 3rd floor in the finish product warehouse of production building B were not installed single motions.
问题补充:

  • 匿名
2013-05-23 12:21:38
有人指出, 2出3紧急出口门的生产建设一个组装车间3楼和2出2紧急出口在生产大楼B的成品仓库3楼的门都没有安装单独的运动。
  • 匿名
2013-05-23 12:23:18
注意到, 2出于在第3楼的3个紧急出口在修造A的生产聚集的车间和在第3楼的2个2个紧急出口在修造B的生产结束产品仓库不是安装的唯一行动。
  • 匿名
2013-05-23 12:24:58
它注意到, 2出于3个紧急出口在第3楼在修造A的生产聚集的车间和2个2个紧急出口在第3楼在生产楼B结束产品仓库不是安装的唯一行动。
  • 匿名
2013-05-23 12:26:38
指出 2 出 3 紧急出口门装配车间的生产 A 栋 3 楼出 2 个紧急出口门在仓库中的数据完成产品的生产 B 栋 3 楼 2 未安装单个动作。
  • 匿名
2013-05-23 12:28:18
它被注意那 3 之中 2 在生产建筑物的集合讨论会 A 和 2 中的 3 楼上的紧急出口门外面在生产建筑物的结束产品仓库的 3 楼上的 2 扇紧急出口门 B 没有安装单一机械装置。
 
 