求翻译:(5)According to the above calculation, the project of A ARR is 19.5%, less than 23.3% of project B. But the project A Payback Period more than project B, and project A: NPV < 0, so it is not acceptable. The project B: NPV > 0. So it is acceptable. The project IRR is greater than the project of A B. In general; choose t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(5)According to the above calculation, the project of A ARR is 19.5%, less than 23.3% of project B. But the project A Payback Period more than project B, and project A: NPV < 0, so it is not acceptable. The project B: NPV > 0. So it is acceptable. The project IRR is greater than the project of A B. In general; choose t
问题补充:

  • 匿名
2013-05-23 12:21:38
( 5 )根据上面的计算,的ARR的项目是19.5 % ,项目B.小于23.3 %,但该项目投资回收期超过项目B和项目答: NPV < 0 ,所以它是不能接受的
  • 匿名
2013-05-23 12:23:18
(5)根据上述演算, A ARR项目是19.5%,少于23.3%项目B。但是项目每回收期更多比项目B,和项目A :NPV < 0,因此不是可接受的。项目B :NPV > 0。因此这是可接受的。项目IRR比A B.项目一般来说选择项目B好比选择项目A.伟大。
  • 匿名
2013-05-23 12:24:58
(5)根据上述演算, A ARR项目是19.5%,少于23.3%项目B。 但项目每回收期更多比项目B,和项目A : NPV < 0,因此它不是可接受的。 项目B : NPV > 0。 如此它是可接受的。 项目IRR大于A B.项目。 总之; 选择项目B好比选择项目A。
  • 匿名
2013-05-23 12:26:38
() 5根据上述的计算,该项目 A ARR 是 19.5%,低于项目 B.23.3%但 A 回收期超过项目 B 和项目答: NPV 的项目 < 0,所以它是不能接受.项目 b: NPV > 0。所以它是可以接受的。该项目的 IRR 大于 A B.项目一般情况下 ;选择项目 B 会比选择项目 a 中。
  • 匿名
2013-05-23 12:28:18
(5) 根据以上计算,一 ARR 的项目是 19.5%,项目 B.But 的少于 23.3% 项目一段偿还时期多于项目 B,项目 A:NPV <0,这样它不是可接受的。项目 B:NPV >0.这样可接受的。项目 IRR 大于一名 B.In 将军的项目;选择项目 B 将是比选择的更好的项目 A.
 
 