|
关注:1
2013-05-23 12:21
求翻译:After running the power flow analysis, or while running the power flow analysis, reactive power limit is checked and if violated the voltage setting is removed and the generator treated as a PQ bus.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
After running the power flow analysis, or while running the power flow analysis, reactive power limit is checked and if violated the voltage setting is removed and the generator treated as a PQ bus.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区