当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:If the Sub-Contractor fails to pay, the Contractor may pay such amount and such amount together with any additional cost in this connection shall be set-off by the Contractor under Clause 26.13.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
If the Sub-Contractor fails to pay, the Contractor may pay such amount and such amount together with any additional cost in this connection shall be set-off by the Contractor under Clause 26.13.
问题补充:

  • 匿名
2013-05-23 12:21:38
如果分包商未能支付,承包商可能会在这方面的任何额外费用,应设置关闭根据第26.13承包人支付这些金额及该金额在一起。
  • 匿名
2013-05-23 12:23:18
如果转承包商不支付,承包商也许支付这样数额,并且与所有增加成本一起的这样数额就此而论将由在条目26.13下的承包商引起。
  • 匿名
2013-05-23 12:24:58
If the Sub-Contractor fails to pay, the Contractor may pay such amount and such amount together with any additional cost in this connection shall be set-off by the Contractor under Clause 26.13.
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
如果分销商无法付款,承包商可能支付这样的数量和和在这连接中的任何附加成本的这样的数量将是在第 26.13 条下通过承包商出发。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭