当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:      Ostenfeld discussed two projects where GBS technology has been used , the recently completed stone belt Bridge in Denmark and the Oresund Bridge currently under construction between Denmark and Sweden . “ The extrapolation of GBS technique to a water depth of 300m has made it conceivable to build a bridge on fixe是什么意思?

待解决 悬赏分:1 - 离问题结束还有
      Ostenfeld discussed two projects where GBS technology has been used , the recently completed stone belt Bridge in Denmark and the Oresund Bridge currently under construction between Denmark and Sweden . “ The extrapolation of GBS technique to a water depth of 300m has made it conceivable to build a bridge on fixe
问题补充:

  • 匿名
2013-05-23 12:21:38
Ostenfeld讨论了两个项目,其中GBS技术已经被使用,在丹麦,目前在丹麦和瑞典之间建设的厄勒海峡大桥最近完成的石带桥。
  • 匿名
2013-05-23 12:23:18
Ostenfeld在丹麦谈论了GBS技术使用了的两个项目,当前最近完整石传送带桥梁和厄勒海峡桥梁建设中在丹麦和瑞典之间。“GBS技术的推测对水深度的300m使它可以想象修筑在固定的基础的一座桥梁横跨直布罗陀海峡”,他结束了。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Ostenfeld 讨论了两个项目,其中已使用 GBS 技术,最近完成的石带在丹麦大桥和正在建设丹麦和瑞典之间的厄勒海峡大桥。他得出结论"GBS 技术在水深 300 米的外推法使它可以想象的固定基础上建一座桥,穿过直布罗陀海峡,"。
  • 匿名
2013-05-23 12:28:18
      Ostenfeld在丹麦谈论了二个项目,使用了GBS技术,当前最近完整石传送带桥梁和Oresund桥梁建设中在丹麦和瑞典之间。 “GBS技术的推测到水深度的300m在固定的基础使它可以想像修筑一座桥梁横跨直布罗陀海峡”,他结束了。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭