|
关注:1
2013-05-23 12:21
求翻译:For these low-bandwidth applications a single-pole compensation scheme is adequate. This should be configured such that it has a crossover below the frequency where significant phase shift enters the 回路. It can then be optimized using network analyzer or 负载 step responses. For designs with complex 负载 and strict transie是什么意思? 待解决
悬赏分:1
- 离问题结束还有
For these low-bandwidth applications a single-pole compensation scheme is adequate. This should be configured such that it has a crossover below the frequency where significant phase shift enters the 回路. It can then be optimized using network analyzer or 负载 step responses. For designs with complex 负载 and strict transie
问题补充: |
|
2013-05-23 12:21:38
对于这些低带宽应用单极补偿方案是足够的。
|
|
2013-05-23 12:23:18
对于这些低带宽应用单一杆报偿计划是充分的。应该配置这这样它有一个天桥在重大周相移动进入回路的频率下。使用网络分析仪或负载阶跃响应,它可能然后被优选。对与复杂负载和严密的瞬变要求的设计,也许需要更加复杂的报偿。
|
|
2013-05-23 12:24:58
为这些低带宽应用唯一杆报偿计划是充分的。 应该配置这这样它有一个天桥在频率之下,重大相移进入回路。 它可能使用网络分析仪或负载阶跃响应然后被优选。 为设计以复杂负载和严密的瞬变要求,更加复杂的报偿也许需要。
|
|
2013-05-23 12:26:38
这些低带宽的应用程序的单极补偿计划是足够的。这应该配置使其拥有一个交叉频率以下地方重大相移进入回路。然后,它可以优化使用网络分析仪或负载阶跃响应。对于复杂负载与瞬态要求严格的设计,更复杂的赔偿可能需要。
|
|
2013-05-23 12:28:18
对这些窄带申请一项单一柱子补偿计划是足够的。这应该被配置,以便它有在显著阶段改变进入的频率下面的一架天桥??.可以然后使用网络分析器被优化或??步骤答复。对有建筑群的设计??以及严格短暂要求,更复杂的补偿可能需要。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区