当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Figure 4.17 shows a layer of soil excavation site monitoring value and reverse calculation comparison between values, from the picture, we can see that the inversion curve and measured curve in the overall trend is consistent with the measured value, the maximum displacement curve occurs at 6m, the cumulative level shi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Figure 4.17 shows a layer of soil excavation site monitoring value and reverse calculation comparison between values, from the picture, we can see that the inversion curve and measured curve in the overall trend is consistent with the measured value, the maximum displacement curve occurs at 6m, the cumulative level shi
问题补充:

  • 匿名
2013-05-23 12:21:38
图4.17示出了一层土挖掘现场监测值和反向值之间的计算比较,从图片中,我们可以看到,在整体趋势的反转曲线和测得的曲线与测量值相一致时,最大位移曲线发生在6米
  • 匿名
2013-05-23 12:23:18
图形, 形状, 数字   描绘, 演算, 表示; 出现, 出名, 估计
  • 匿名
2013-05-23 12:24:58
图4.17显示土壤挖掘站点监视价值层数,并且反向演算比较在价值之间,从图片,我们能看反向曲线和被测量的曲线在整体趋向与测量值是一致的,最大位移曲线发生在6m,渐增平实转移是2.54mm。 反向最大位移的演算价值在6.05m发生,水平的位移的大小是2.4mm,错误是5.5%。 由于在实际监视过程是一个计量误差,在挖掘结构期间,除单独深度之外有明显差错,反向演算价值基本上反射基础坑变形趋向
  • 匿名
2013-05-23 12:26:38
图 4.17 显示一层土开挖现场监测值和反向计算比较值,从这幅图,我们可以看出反演曲线与实测的曲线的整体趋势是符合实测值,最大位移曲线发生 6 米处,累积的电平转换为 2.54 m m。反演计算值的最大位移发生在 6.05 m,水平位移的大小是 2.4 毫米,误差为 5.5%。因为在实际监测过程会测量误差,此外对个人深度都有明显的错误,在挖掘结构的反演计算值基本上反映了基坑的变形趋势
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭