当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Prefabrication. The level of construction information in a BIM model means that prefabrication can be utilised with greater assurance that prefabricated components will fit once on-site. As a result, more construction work can be performed offsite, cost efficiently, in controlled factory conditions and then efficiently是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Prefabrication. The level of construction information in a BIM model means that prefabrication can be utilised with greater assurance that prefabricated components will fit once on-site. As a result, more construction work can be performed offsite, cost efficiently, in controlled factory conditions and then efficiently
问题补充:

  • 匿名
2013-05-23 12:21:38
预制。
  • 匿名
2013-05-23 12:23:18
预铸。建筑信息的水平在BIM模型的意味着预铸可以运用与预制的组分将适合一次本地的更加巨大的保证。结果,在受控工厂情况可以高效率地不合规则地进行,费用,高效率地然后安装更多建筑工作。
  • 匿名
2013-05-23 12:24:58
预铸。 建筑信息的水平在BIM模型意味着预铸可以运用以prefabricated组分将适合一次本地的更加巨大的保证。 结果,更多建筑工作可以高效率地是执行的offsite,费用,在受控工厂情况高效率地然后安装。
  • 匿名
2013-05-23 12:26:38
预制。信息化建设在 BIM 模型的一种手段可以用预制组件的更好保证利用预制的水平将适合一旦现场。作为一个结果,更多的建设工作可以进行的异地,高效,在严格控制的工厂的条件下,然后有效地安装。
  • 匿名
2013-05-23 12:28:18
预制。在一个 BIM 模型中的程度的建造信息表示装配工前可以随着预制组件的更大的保证被利用将适合曾经现场。因此,更多建造工作可以被实行非实地,有效地花费,在被控制的工厂条件中,然后有效地安装。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭