当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Supply, delivery, installation, testing, commissioning (which shall include all Operation Readiness Trials) of CUTE equipment including all necessary cabling, cable support, termination and accessories including wall, floor penetrations and re-sealed with approved fire stop material to the following :是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Supply, delivery, installation, testing, commissioning (which shall include all Operation Readiness Trials) of CUTE equipment including all necessary cabling, cable support, termination and accessories including wall, floor penetrations and re-sealed with approved fire stop material to the following :
问题补充:

  • 匿名
2013-05-23 12:21:38
供应,交付,安装,调试,试(其中应包括所有工作准备试验) CUTE设备,包括所有必要的电缆,电缆的支持,终端和配件,包括墙壁,地面渗透和再密封的认可挡火材料如下:
  • 匿名
2013-05-23 12:23:18
供应,交付,设施,测试,委任(将包括所有操作准备试验)逗人喜爱的设备包括所有必要缚住,电缆支持、终止和辅助部件包括墙壁,地板渗透和重新密封与批准的火中止材料对以下:
  • 匿名
2013-05-23 12:24:58
供应,交付,设施,将包括 (逗人喜爱的设备所有操作准备试验) 包括所有必要的缚住,电缆支持、终止和辅助部件包括墙壁,地板渗透和重新密封与批准的火中止材料对以下的测试,委任:
  • 匿名
2013-05-23 12:26:38
供应、 交付、 安装、 测试、 调试 (其中应包括所有操作准备试验) 的可爱的设备,包括所有必要布线、 电缆支架、 终止和配件,包括墙体、 楼板贯穿和重新加盖核准的火站到以下材料:
  • 匿名
2013-05-23 12:28:18
供应,发送,安装,检查,委托 ( 那将包括所有操作准备就绪审讯 ) 包括墙包括所有必要电缆连接布线,电缆支持,终止和附件的聪明伶俐的设备中,地板渗透和重新密封%
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭