求翻译:With pilot method in construction, the steps in the left hole excavation, inverted arch part of the left hole loose loose zone and the formation of the middle drift before excavation area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when the constructio是什么意思?

待解决 悬赏分:1 - 离问题结束还有
With pilot method in construction, the steps in the left hole excavation, inverted arch part of the left hole loose loose zone and the formation of the middle drift before excavation area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when the constructio
问题补充:

  • 匿名
2013-05-23 12:21:38
随着建设试点的方法,在左洞开挖步骤,左洞松松区和中部漂移形成开挖前区重叠,形成一个有机的整体的仰拱部分,幻灯片极易发生偏差,一定要加强
  • 匿名
2013-05-23 12:23:18
试验方法在建筑,在左孔挖掘的步,左孔的被倒置的曲拱零件宽松宽松分区,并且中间漂泊的形成在重叠挖掘的区域前的形成一个有组织的整体,滑容易地发生倾斜,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
  • 匿名
2013-05-23 12:24:58
以试验方法在建筑,步在左孔挖掘,左孔的被倒置的曲拱零件宽松宽松分区,并且中间漂泊的形成在挖掘区域之前重叠形成一个有组织的整体,滑容易地发生倾斜,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
  • 匿名
2013-05-23 12:26:38
与建设中的试验方法,在左的洞开挖步骤倒拱部左的洞松动松动和中间漂移形成开挖区域重叠,形成一个有机的整体,幻灯片很容易发生偏差之前,一定要加强监控量测,当隧道中墙应力值的建设是 10.3 MPa。
  • 匿名
2013-05-23 12:28:18
以在建造,在左边孔挖掘中的步骤中的飞行员方法,使部分左边孔松散地松散地将其分区的拱转化和中间的漂流物的构成重叠形成一个组织的整体的挖掘地区滑动容易被发生的偏见之前,在隧道中间墙压力价值的建造是 10.3 MPa 时,确保加强监测测量。
 
 