当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:With central drift method in construction, after the excavation of left tube upper bench, loose zone of inverted arch in the left tube and the formation of the middle drift before excavation area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when the con是什么意思?

待解决 悬赏分:1 - 离问题结束还有
With central drift method in construction, after the excavation of left tube upper bench, loose zone of inverted arch in the left tube and the formation of the middle drift before excavation area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when the con
问题补充:

  • 匿名
2013-05-23 12:21:38
中央导坑法施工,左筒上部替补,左管仰拱,中间漂移形成开挖前区重叠,形成一个有机的整体松散区开挖后,滑动极易发生偏差,一定要
  • 匿名
2013-05-23 12:23:18
中央漂泊方法,当隧道中间墙壁重音价值的建筑是10.3 MPa,在建筑,在左管上部长凳的挖掘以后,被倒置的曲拱宽松区域在左管的和中间漂泊的形成在重叠挖掘的区域前的形成一个有组织的整体,滑容易地发生倾斜,是肯定加强监视测量。
  • 匿名
2013-05-23 12:24:58
以中央漂泊方法,当隧道中间墙壁重音价值的建筑是10.3 MPa,在建筑,在左管上部长凳的挖掘以后,被倒置的曲拱宽松区域在左管和中间漂泊的形成在挖掘区域之前重叠形成一个有组织的整体,滑容易地发生倾斜,是肯定加强监视测量。
  • 匿名
2013-05-23 12:26:38
随着中心漂移法在施工,左的管上部的长椅上,仰拱左管松动和前开挖区域重叠的中间漂移形成开挖后,形成一个有机的整体,轻松地滑发生偏差,一定要加强监控量测,当隧道中墙应力值的建设是 10.3 MPa。
  • 匿名
2013-05-23 12:28:18
以在建造中的中央漂流物方法,在左边管子的挖掘之后上层的长凳,在左边管子和中间的漂流物的构成中的转化的拱的松弛的区域重叠形成一个组织的整体的挖掘地区滑动容易被发生的偏见之前,在隧道中间墙压力价值的建造是 10.3 MPa 时,确保加强监测测量。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭