当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In a scenario with T=24 with heaviest loads beginning late in the day the optimization results showed that it was feasible to exploit a business opportunity to handle a spot shipment of 400 mmcfd, over half of which was borrowed for a time fromline pack without impacting current or future projected deliveries. Moreover是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In a scenario with T=24 with heaviest loads beginning late in the day the optimization results showed that it was feasible to exploit a business opportunity to handle a spot shipment of 400 mmcfd, over half of which was borrowed for a time fromline pack without impacting current or future projected deliveries. Moreover
问题补充:

  • 匿名
2013-05-23 12:21:38
在一个场景中以T = 24,最重的负载开始晚了一天优化结果表明它是利用一个商业机会来处理400 mmcfd的现货出货可行的,其中一半以上是借来的时间fromline包,而不会影响
  • 匿名
2013-05-23 12:23:18
在与T=24的一个情景与担子后开始在优化结果表示的天,是可行的利用商机处理400 mmcfd的斑点发货,在一半为时间fromline组装被借用,不用冲击的现在或未来射出了交付。而且,它正确地显示了在哪些驻地和whenthe力量要求将要求履行这个发货合同。
  • 匿名
2013-05-23 12:24:58
在一个情景与T=24与后开始在天的重载优化结果表示,它是可行的利用商机处理400 mmcfd的斑点发货,结束一半,其中为时间fromline组装被借用了,不用冲击的潮流或未来射出了交付。 而且,它确切地显示了在将要求哪些驻地和whenthe力量要求履行这个发货合同。
  • 匿名
2013-05-23 12:26:38
在重负荷开始晚的优化结果表明这是可行的利用商业机会来处理 400 mmcfd 现货发货与 T = 24 场景中,超过一半的借来的时间 fromline 为包而不会影响当前或未来的预计的交付。此外,它表明正是在其中将要求站和当电力需求,为履行本装运合同。
  • 匿名
2013-05-23 12:28:18
在有 T 的一个设想中 = 具最重的负荷起点的 24 最后优化结果显示它可行的利用处理 400 mmcfd,对哪个为一个时期的 fromline 包裹被借用而没有影响当前或者将来被预计的发送的超过一半的点发货的一次商业机会。此外,确切地显示哪个站和 whenthe 力量需求会被要求履行这份发货合同。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭