当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Figure 6 and Figure 7 showed the ground coordinates which had been calculated and perfectly overlapped with the digital line graph in ArcGIS software. Figure 7 shows that the second point in the upper right-hand corner is not overlapped with the DLG. It is because the appearance of the building is sometimes herringbone是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Figure 6 and Figure 7 showed the ground coordinates which had been calculated and perfectly overlapped with the digital line graph in ArcGIS software. Figure 7 shows that the second point in the upper right-hand corner is not overlapped with the DLG. It is because the appearance of the building is sometimes herringbone
问题补充:

  • 匿名
2013-05-23 12:21:38
图6和图7显示出已被计算并完全重叠在ArcGIS软件数字线图的地面坐标。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
图6和图7显示了地面座标哪些与数字线路图表在ArcGIS软件计算了和完全重叠了。 Figure 7 shows that the second point in the upper right-hand corner is not overlapped with the DLG. It is because the appearance of the building is sometimes herringboned. During DLG production, DLG is usually extracting 4 corner points rather than 6 points i
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
图 6 和图 7 显示地调整那被计算了和完美在 ArcGIS 软件中利用数字线图表重叠。图 7 显示在上面右手的角落的第二个点不被利用 DLG 与互搭。是因为建筑物的外表被有时成箭尾形。在 DLG 生产期间, DLG 通常在每个拐角点中在提取 4 个拐角点,而非 6 点。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭