|
关注:1
2013-05-23 12:21
求翻译:Supply, installation and testing of pipes UPVC agenda item 80 includes washing and sterilization in accordance with AWWA C 651 and all air connections and valves at each rising and valves required in accordance with the specifications, drawings and maintenance requirements bearing on the item water hammer arrestors.是什么意思?![]() ![]() Supply, installation and testing of pipes UPVC agenda item 80 includes washing and sterilization in accordance with AWWA C 651 and all air connections and valves at each rising and valves required in accordance with the specifications, drawings and maintenance requirements bearing on the item water hammer arrestors.
问题补充: |
|
2013-05-23 12:21:38
供应,安装和管道的检测UPVC议程项目80包括洗涤和消毒按照AWWA Ç 651 ,所有的空气连接和阀门在每个符合规范,图纸和维护要求的轴承上的项目水锤消除器所需的上升和阀门
|
|
2013-05-23 12:23:18
供应、安装和测试管道UPVC议程项目80包括清洗和消毒按照awwa C651和所有的空气连接和阀门在每个上升和阀根据技术规范、图纸和维护要求的项目影响避雷器水锤。
|
|
2013-05-23 12:24:58
供应,设施和测试管子UPVC议程项目80包括洗涤和绝育与AWWA C 651符合和所有空气连接和阀门在每上升和阀门需要与规格、图画和维护要求符合对项目水击逮捕有影响。
|
|
2013-05-23 12:26:38
供应,安装,UPVC 管道检测的议程项目 80 包括清洗、 灭菌 AWWA C 651 和所有空气连接和在每个上升阀和阀须符合技术规格、 图纸和轴承项目水锤避雷器的维护要求。
|
|
2013-05-23 12:28:18
烟斗的供应,安装和测试 UPVC 议程项目 80 以每上升和按照有关条款水锤逮捕者的规格,素描和维护要求举止需要的阀门包括按照 AWWA C 651 和所有空气连接和阀门的洗涤和消毒。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区