当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Let's take a look at the total quality management and quality system, the cost of what happens. First, when adding appropriate prevention cost of quality management system engineering work, can reduce the number of product defects and deviations, the defect of the actual decline means to reduce failure costs.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Let's take a look at the total quality management and quality system, the cost of what happens. First, when adding appropriate prevention cost of quality management system engineering work, can reduce the number of product defects and deviations, the defect of the actual decline means to reduce failure costs.
问题补充:

  • 匿名
2013-05-23 12:21:38
让我们来看看在全面质量管理和质量体系,会发生什么成本。
  • 匿名
2013-05-23 12:23:18
让我们来看一看总的质量管理和质量体系,成本的时候,会发生什么情况。 第一,当添加适当的预防质量成本管理系统工程,可以减少产品的缺陷和偏差、缺陷的实际下降的手段,降低故障成本。
  • 匿名
2013-05-23 12:24:58
我们采取神色在全面质量管理和质量系统,发生了什么的费用。 首先,当增加适当的预防质量成本经营管理系统工程工作时,可以减少产品缺陷的数量,并且偏差,实际衰落的瑕疵意味减少失败费用。
  • 匿名
2013-05-23 12:26:38
让我们看看全面质量管理和质量体系,会发生什么成本。首先,当添加适当的预防成本工程工作的质量管理体系,可以减少产品缺陷和偏差,减少失败成本的实际下降手段的缺陷的数目。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭